Lampada Estate Stage 1

Client: McCloy Group

Cost: $2.6M

Capability: Residential & Rural Residential Subdivisions

Location: Calala, Tamworth

Duration: 18 weeks

Overview:

Lampada Estate is the McCloy Group’s first project in the New England Region where KCE have been a leading Civil Contractor since 2005. The subdivision is a 40 hectare parcel of land in close proximity to the Tamworth CBD.

The project commenced in January 2013 with the construction of Lampada Fields (13 Rural Residential Lots) and Lampada Dawn (31 Residential Lots). 

Scope of work:

• 15 000m3 of bulk earthworks
• 1.3km or 11 000m2 of newly constructed roads and drainage
• Landscaping including turfing and street trees
• Concrete pathways
• Park and recreation area
• Over 6.5km extensive utilities and drainage installation (including water, sewer, electrical, NBN, drainage and lead in services)

Highlights and challenges:

• With marketing and the proposed open day critical for the McCloy Group, KCE were able to achieve an accelerated program of just 18 weeks
• Multiple fronts and subcontractor coordination was carefully managed to ensure program was achieved