Gillieston Grove Stage 1

Client: Ceretti Developments

Cost: $3.1M

Capability: Residential Subdivisions

Location: Gillieston Heights

Duration: 26 weeks

Overview:

This project is the first of 4 stages delivering 38 new housing lots and a large water quality control pond and wetland. Lead in utility services and road adjustments formed part of this project.

Scope of work:

• 38 residential lots
• Demolition and cleanup of existing structures
• A new waste water pump station and rising main
• New roads and drainage
• Utilities installation (including water, sewer, electrical, NBN and gas)
• Construction of a substantial stormwater quality control pond and wetland
• Extensive earthworks and regrading of lots to reduce site costs for future land-owners and enable road formations and drainage channel construction

Highlights and challenges:

• Delivery of the project during extended wet weather and challenging weather conditions
• Management of earthworks processes to reduce cost and optimise building conditions